Campus, Reading International
December 9, 2021
Work began on Campus, Reading International in June 2021. The scheme will offer 1,500 sq ft to 180,000 sq ft of extensively refurbished collaborative and community-focused office space. The project comprises the creation of a new reception and entrance archway, new building restaurant and workspace area, new gym, changing and cycling facilities, a yoga studio, a multi-function event space, a town hall facility and more to provide a market leading amenity and wellness provision.
Our clients, Alchemy Asset Management and Tristan Capital Partners, intend the building to be an exemplar of contemporary refurbishment and repositioning in the business park market. This is particularly important in a post Covid environment where ESG credentials and Wellness have come to the forefront. Campus will deliver a truly unique scheme that sets a benchmark for the future of offices.
Specifically, the market is now encouraging intentional office design to foster a culture of health and well-being for occupiers. Therefore, we can say that wellness in the workplace is becoming a rapidly emerging topic and there is a wider change in the way the industry is thinking about sustainability.
Campus, Reading International will target a WELL rating of ‘Platinum’, WELL Health-Safety certification, a BREEAM rating of ‘Excellent’ and a WiredScore rating of ‘Platinum’, as well as a displacement ventilation system, which will deliver the cleanest air and maximum air volumes post Covid.
The Displacement ventilation system reduces the amount of airborne contaminants in the environment because, unlike a traditional mixed-mode system, the displacement system supplies 100% fresh air at a low level and then extracts polluted air at a high level. There is no recirculation of the polluted air unlike, say, a 4 pipe system that only delivers about 20% fresh air. The displacement system also moves away from traditional fossil fuel combustion and towards a mechanical plant that is fully operational on electric power via heat pump technology and a green energy supply.
Throughout the project, the design team focused on circular economy principles to reduce waste and increase the reuse of materials. To date 98% of the waste from the construction works has been diverted from landfills.
A project goal was also to promote sustainable forms of transport and futureproof the building. The building will now have120 electrical vehicle chargers for both tenants and visitors and extensive cycling provision including bike storage, electric bike charging, drying facilities and showers.
The on-site 4,000 sq ft gym will have state of the art equipment and live as well as recorded classes for its members. There is also a multifunctional space that will allow building occupants to hold catered meetings for internal and external purposes. There are no other buildings in the immediate market which offer landlord managed gym and wellness amenities to the scale of Campus.
Here are some fantastic photos of Campus, Reading International. It is a real privilege to work on this stunning building.
Recent Posts
APPOINTMENT OF NEW DIRECTOR
September 16, 2024
Spotlight Interview
March 7, 2024
OUR CHARITY OF THE YEAR 2024
January 3, 2024
COMPANY AWAY DAY 2023
December 3, 2023
Green Construction Practices in the UK
August 22, 2023
Great Evening at the Lord’s Cricket Ground
May 30, 2023
Retrofit / Adaptation of Historic Buildings
April 18, 2023
Women in Construction
March 13, 2023
Why is the PBSA Market So Resilient?
March 10, 2023